Cases

Real systems, with their real status.

I would rather show what we built and sustained than a wall of logos. When a project is in development I say so; when it reached national production, I say that too.

Documented work

Public road sector

SISCAP

2012–2018 · national production

Challenge

An ageing toll revenue system, with manual per-department deployments, dependence on lane equipment and no central traceability of operations.

What we did

  • Relational analysis and design of the system data
  • Source code changes and deployment across 7 departments
  • Support for toll and weighing posts, and coordination of satellite connectivity
  • Administration of centralised databases and nationwide backups

Status and outcome

  • Sustained national operation throughout the period
  • Knowledge base later reused for centralised monitoring
National monitoring

SNCPD

2015–2017 · 5 departments

Challenge

Each station reported in isolation: there was no national view and no standard integration with lane and weighing peripherals.

What we did

  • Development of the tracking and monitoring system
  • Deployment across 5 departments
  • Integration of weight indicators, traffic lights, barriers and IP cameras

Status and outcome

  • Centralised view of stations and weighings
  • Integration protocol reused in later proposals
Our own product

Tykun Hub

In development · foundations deployed

Challenge

Digital affiliates cannot prove which ad produced each sale: attribution is lost between the landing page, the affiliate network and the ad platform report.

What we did

  • Multi-tenant architecture with row-level isolation and an append-only ledger
  • OIDC identity, opaque click identifier and signed server-to-server postback
  • Plan entitlements and usage metering in the core

Status and outcome

  • Foundations deployed and verified with cross-tenant isolation tests
  • Dashboard, landing editor and public tracker under construction

Transparency

How we present a case

We do not publish client names, revenue figures or system screenshots without written permission. The cases on this page are documented work of our own and their status is updated when it changes.

If you need a verifiable reference for a tender or an internal evaluation, we discuss it privately and within the appropriate scope.

Do you have a similar case?

That is exactly what the assessment is for: compare your situation with what has already been built and decide what to do first.